DbissBuilding surveys & drone inspection

Dated photographic record

Schedule of condition

A dated, photographed record of the condition of a property, so there is clear evidence to refer back to if questions about damage or repair arise later.

from £440 · £605 for a home worth £400k to £500k

Prices include VAT.

Get your price Call 07572 190983

Uses
Leases, work next door and your own building projects
You get
A written schedule with dated photographs
Drone
Roof images as an add-on, where flight is permitted
Report
Typically within 5 working days

Who it's for

A schedule of condition is useful whenever you may later need to show what a property was like on a particular date. Common reasons include:

  • Starting a lease. Landlords and tenants of commercial premises, and of homes, can use it as the agreed starting point for repair and dilapidations questions at the end of the lease.
  • Building work next door. If a neighbour is about to extend, convert a loft, dig a basement or demolish a building, a record of your home made before work starts gives you evidence if damage appears later.
  • Your own building work. If you are about to start a project, a record made first helps settle later questions about damage to your property or, with permission, to a neighbour's.

Leases and dilapidations

At the end of a lease, a landlord may make a dilapidations claim for breaches of the tenant's repair, redecoration and reinstatement obligations. A schedule of condition made at the start gives both sides an agreed record of the condition of the premises when the tenant took them on.

If the lease is drafted to refer to the schedule, the tenant's repairing obligation may be limited to keeping the premises in no worse condition than the schedule shows. That depends on the wording of the lease, so ask your solicitor how the schedule should be referred to, and make sure the agreed version is attached to the lease.

Building work next door

If building work affects a party wall or a boundary wall, or involves digging foundations close to a neighbour's building, the Party Wall etc. Act 1996 may apply. The owner doing the work must then give notice to the neighbours affected, and GOV.UK explains how the process works. Where surveyors are appointed under the Act, they often record the condition of the neighbouring property before work starts.

We do not currently act as a party wall surveyor. A schedule of condition from us can still help where work falls outside the Act, or where you want your own independent record before work starts. If cracks or other damage appear later, you have dated evidence of the condition beforehand.

What we record

We agree the scope with you before the inspection: the whole property, or only the parts likely to be affected. We then record, in a set order:

  • each room, including ceilings, walls, floors, doors, windows and fixed fittings
  • existing cracks, with their position, length and approximate width
  • staining, damp marks, damage and wear
  • external walls, roofs seen from the ground, gutters, boundary walls, paving and outbuildings
  • the roof in more detail, if you add drone images and flight is permitted

Each entry is linked to a dated photograph.

What you get

A written schedule with a numbered entry for each item and the photographs that support it. It is written to be read by others, such as the other party, their surveyor or a solicitor, as well as by you.

The schedule is typically issued within 5 working days of the inspection, or within 2 working days with the paid express option. Once it is issued, we offer you a call to talk it through.

What it does not cover

A schedule of condition is a record, not a survey. It does not include:

  • advice on the causes of defects, the repairs needed or their cost. For that, a Level 3 survey or a specific structural inspection may suit you better
  • an inventory of furniture and contents
  • acting as a party wall surveyor, or preparing a party wall award
  • an assessment of dilapidations liability, or legal advice on a lease
  • parts that are hidden or unsafe to reach, or areas we are not given access to
  • moving furniture or stored items, or lifting floor coverings

How it works

  1. Get your price

    Choose the survey and enter the property value and postcode. The price includes VAT and any travel supplement.

  2. Book and sign

    Confirm your booking and sign our terms online. You can cancel within 14 days.

  3. Inspection

    Andrew inspects the property. For a Level 3 we check the airspace and the weather and fly the drone where permitted.

  4. Your report

    We invoice you after the inspection, and issue the report once it is paid: typically within 5 working days of the inspection, or 2 with the express option.

  5. Talk it through

    We offer you a call with the surveyor to go through the findings and your next steps.

Prices

Schedule of condition prices are fixed by the value of the property and include VAT. Drone roof images, where flight is permitted, and the express report are optional extras. A travel supplement applies beyond about 25 miles of Hemel Hempstead, and the price calculator adds it for you. If you need a schedule of commercial premises, or of only part of a building, contact us before you book so we can confirm the scope.

Property valuePrice
Up to £100k£440
£100k – £200k£470
£200k – £300k£550
£300k – £400k£550
£400k – £500k£605
£500k – £600k£605
£600k – £700k£660
£700k – £800k£715
£800k – £900k£770
£900k – £1m£825
£1m – £1.25m£860
£1.25m – £1.5m£970
£1.5m – £1.75m£1,045
£1.75m – £2m£1,155
Over £2mIndividual quote

Add drone roof images for £95 where flight is permitted.

Prices include VAT at 20%. Express report within 2 working days: £95. Addresses more than 25 miles in a straight line from our base (HP3 8PF): £45 travel supplement, included in your quote.

Questions

What is a schedule of condition?

A factual record of the condition of a building on a set date, room by room and outside, supported by dated photographs. It records what is there and the state it is in. It does not diagnose causes, recommend repairs or give costs.

Do I need one before signing a commercial lease?

It is worth considering, especially for older premises or where you will be responsible for repairs. If the lease refers to an agreed schedule, your repairing obligations may be measured against it at the end of the term. Ask your solicitor how the schedule should be referred to in the lease.

My neighbour is about to start building work. Can you record my home first?

Yes. We can record the condition of your home before work starts, concentrating on the parts nearest the work if you prefer. Book as early as you can, so the record is made before any work begins.

Do you act as a party wall surveyor?

No. We do not currently act as a surveyor under the Party Wall etc. Act 1996. A schedule of condition from us can still be useful where work falls outside the Act, or as your own independent record.

Can you record a neighbour's property?

Only with the owner's permission and access. Without access, we can record only what can be seen from your property or from public areas, and the schedule will say so.

Should the other party agree the schedule?

A schedule is more useful when both sides have seen it and accepted it as an accurate record at the start. If you ask us to, we can send a copy to the other party or their adviser.

CallGet your price